Question: 1
An architect has designed an HPE BladeSystem with Flex-10D Virtual Connect that connects to HPE 5830 switches The architect needs to ensure that the solution simplifies the customers campus Ethernet.
Which additional HPE technology should the architect recommend to the customer?
A. Intelligent Resilient Framework (IRF)
B. Shortest Path Bridge Mac in Mac (SPBM)
C. Fiber Channel over Ethernet(FCoE)
D. RDMA over Converged Ethernet (RoCE)
Answer: C
Question: 2
A customer needs to deploy SAP HANA The customer needs a scale-out solution to accommodate an increase m workload over the next two years
Which ProLiant series should the architect recommend to the customer?
A. HPE ProLiant 300
B. HPE ProLiant 100
C. HPE ProLiant BladeSystem
D. HPE ProLiant 500
Answer: D
Question: 3
An administrator is planning a Synergy 12000 frame deployment The administrator needs to configure the compute node types in the frame
In the graphic of the Synergy Planning Tool, click the option that the administrator needs to use to configure the compute nodes.
Which tool should an architect use to research the technical spec locations of various Smart Array controllers'?
A. HPE Product Bulletin
B. SalesBuilder for Windows
C. Proposal Web
D. HPEiQuote
Answer: D
Question: 4
A customer needs to improve the performance of a CPU intensive application running on an HPE ProLaint DL 360 Gen9 server with an Intel Xeon E5 processors The architect proposes to add an Intel Phi coprocessor extensions to me server.
What should an architect verify to ensure the coprocessor will improve application performance?
A. that the application is able to work in a clustered environment
B. that the application is highly parallel and can scale to more than one hundred threads
C. that the server connected with a 40Gb/s network interface card
D. that the server has a minimum of 24GB ECC-capable RAM installed
Answer: C
Question: 5
How does the HPE BladeSystem architecture meet the changing needs of data center customers?
A. introduction of Active Health System monitor
B. system management using HPE Virtual Connect modules
C. enables customers to shift investment from maintenance to innovation
D. consolidated deployment of firmware via HPE Agentless Management
Answer: A
Question: 6
A customer has a ProLiant DL based server solution The customer is experiencing high write latency with its virtual desktop infrastructure running on this solution
Which solution will increase the application performance and reduce the use of resources?
A. Upgrade the current processor to the E5-4800 v5 processor
B. Add a PCle workload Accelerator
C. Migrate to PCle Solid State Drives
D. Upgrade memory to 2133 MHz DDR4
Answer: D