- Views: 6
- Report Article
- Articles
- Business & Careers
- Industrial
Construction Management Services
Posted: Sep 26, 2018
Construction work is a very real issue for many engineers and other related specialists. In this article, I will review the main construction and assembly processes, the participants in the process, the management of the construction work and the general quality requirements.
Construction and assembly processes
The construction and installation process is called the production process, which takes place directly at the construction site and whose ultimate goal is to build the production.
The construction works are divided into:
- Construction of new buildings - is a new building or a new construction of public services and services
Construction of communications for the expansion of an existing building construction, restoration of destroyed cultural heritage values;
- Construction of operational buildings - is used for maintenance, repair, reconstruction or demolition of buildings.
Construction process - the set of operations performed by the constant composition of the workers in the established technological coherence.
The construction work is all the work carried out for the construction or demolition of the building.
The construction works are divided: - General construction work: work ground (ground relief management, foundation pit construction, excavation, transport of engineering networks, construction of mines and fillings, excavation of excavations, communications services of loading docks to build, channels and ditches, and its affirmation of the slopes claim the excavation and filling of agricultural drainage works and irrigation systems for equipped dredging, sea and inland waters, filling of dams and other similar works of land profile) ; concrete, masonry, metal, wood and other building construction elements of installation and construction works, insulation of construction, internal and external decoration construction.
- Special construction: mechanical works (buildings and external water supply, sewerage, gas, heat production and supply of heating and ventilation systems for buildings and other similar installation of profiles); electrical works (power supply, transformation, distribution, lighting control, automation, telecommunication, otherwise, telecommunications, fire alarm protection and other works of similar profile).
Participants in the construction process
Producer (customer)
Producer (customer) is the main topic of the construction process. It manages capital contracts (shares or checks) with other entities of the construction process, the most organized or carried out by construction process works.
Contractor (subcontractor)
Being the construction contractor, you have the right to:
- Registered companies, which the statutes provide for the construction of their activities.
- a natural person, a government according to the patent count of the construction works;
Management of construction work
Construction work is carried out only by certified supervisors:
Construction manager: a person who has a higher education in engineering, certification, represents the contractor or builder to comply with the construction project from the beginning to the statics.
The recognition of proper use, although a potentially general construction manager, is responsible for the construction of static normative quality.
Special work leader of Construction work: a natural person who is superior or superior engineering education, certification, representing the builder or contractor (subcontractor) to fulfill the construction project, headed by the Trust for a special job technically is under the authority of Construction Manager and is responsible for the quality of regulatory systems.
The general manager of construction work - an individual who has a certified higher engineering education, leads the general construction, technical issues under the authority of the construction manager responsible for the construction of standard quality.
E & I System integration Services