BIM and PLM: strong complementarity

Author: Step Engineering
by Step Engineering
Posted: Jan 27, 2019

When we launched our offer combining BIM and PLM that was dedicated to the Architecture, Engineering and Construction (AEC) sector, we wrote an article to underline the complementarity between BIM and PLM. This article and more precisely the complementarity is still valid. In fact, the questions and recurrent exchanges that we have with many actors of the ACS are the best confirmation of this. More and more companies in this sector realize that BIM alone is not enough to guarantee efficient collaboration and management of the project.

The essential roles performed by PLM (Product Life Cycle Management) and BIM (Construction Information Model) in real estate construction and operation projects are well known. However, these two concepts are often studied independently.

BIM and PLM: How do they link with each other?

BIM (Building Information Model) allows IFC (Industry Foundation Classes) to represent a set of structured information about an existing or planned building. Therefore, BIM offers a collaboration platform between the different construction stakeholders. The latter allows interoperability between different business software through IFC.

Consequently, BIM is one of the key building blocks for the collaboration of different stakeholders. However, to ensure good management of the life cycle of the project / building, there is a need for a complementary solution. In fact, BIM covers the life cycle of the building but it does not differ with the management of PLM.

BIM focuses on the functions of visualization, the calculation of properties and the verification of the interactions between the different elements. It does not deal with the management of documents or the control of reports and versions of documents.

PLM formalizes the processes of validation, exchange, modification, etc. whereas the BIM is more like a redundant copy that we try to maintain.

Is there any interest in incorporating BIM and PLM? If so, how?

First, as we said earlier, it is important to properly differentiate BIM and PLM. We must bear in mind that they are two different but complementary principles. This particular complementarity allows a complete management of the infrastructure throughout the project cycle

In the project of thinking! In France (previously, Lascom AEC), we carry out research projects to implement a "PLM-BIM" metamodel through our software application. This "PLM-BIM" application makes it possible to use the IFC file as input to generate all tree views and technical objects in the PLM direction. Depending on the modifications or evolutions of documents and data within the PLM, the global IFC file can be updated automatically. In addition, in addition to the benefits of BIM and PLM, the "PLM-BIM" application provides additional benefits due to the complementarity of these con

Construction phases - Learn about the workflow stages of an architect!

  • 1 basic determination

The first step includes the evaluation of the ideas and requirements for the project. In addition, the discussion of the time frame and the different phases of construction occur during this time.

This first phase of construction begins with the evaluation of fundamental issues. Where will the project be located? When is the beginning of the first construction works? What is the use of the building? In addition, the architect supports the builder by inspecting the locations that are under consideration. As soon as the financing plan is clarified, the discussion about the course of the construction phases begins.

About the Author

E & I System integration Services

Rate this Article
Leave a Comment
Author Thumbnail
I Agree:
Comment 
Pictures
Author: Step Engineering

Step Engineering

Member since: Jul 12, 2018
Published articles: 31

Related Articles