How do I construct a steel structure workshop, and the construction process of a steel structure plant: The steel structure plant itself has the characteristics of light weight, high strength, strong compression resistance, and short construction period. The perfect artistic structure after adding aesthetics is an important reason why it has quickly become a hot spot. At present, there are many large, diverse and complex steel structures and civil buildings in many places in China. The emergence of steel structure workshops as a new type of construction mode has swept the traditional construction mode with a strong attitude. The emergence of standard steel structure workshops has greatly helped some manufacturing companies. For example, the seismic performance and open space of standard steel structure workshops meet the needs of manufacturing plants. The following will introduce the construction process of steel structure workshop in detail by YILI Steel Structure:

Concrete construction process of steel structure factory:

  1. Hoisting of the main structure of the steel structure workshop: ground splicing steel beams, erecting steel columns, hoisting steel beams, connecting substructures, correcting structural deviations of the main structure, installing crane beams (optional), hoisting mezzanines (optional), painting Fire-resistant paint. The deviation of the main structure of the steel structure workshop should meet the specifications and design requirements, and the initial and final tightening of high-strength bolts should meet the requirements.
  2. Secondary structure installation of steel structure workshop: roof wall purlin, roof wall support, flange support, etc.
  3. Installation of house panels and thermal insulation layer of steel structure factory: the thermal insulation layer should be laid first, and then the roof panel should be installed (some projects also lay a wire mesh under the thermal insulation layer to prevent the thermal insulation layer from falling off, which mainly depends on the thermal insulation layer level ). The roof is mainly waterproof. Therefore, it is necessary to overlap the billboard with the wooden board, nail the wooden board, the glue should be full and dissatisfied, the glue should be wiped clean, and the coating on the board should not be damaged to prevent rusting.
  4. Maintenance and installation of the wall of the steel structure workshop: mainly install wall insulation and wall panels. The wall surface is mainly an aesthetic problem and the waterproofing of the window area. There is also the problem of determining whether there is a deviation in the installation. For example, the bottom should be flat, the entire plane should be flat, and the flatness deviation between the plates should meet the requirements.

5. The detailed structure of the steel structure standard workshop: mainly some decorative installations, such as the wrap angle between the roof and the wall, the wrap angle at the corner of the wall, the waterproof panel between the wall panel and the brick wall, and the decoration of doors and windows. The detailed structure is the last part of the beautiful project and one of the main components, so horizontal, flat and vertical are the most basic.

more in :http://en.qdyili.com/products/Steel-Structure-Workshop/

About the Author

Steel Structural analysis is a very important part of a design of buildings and other built assets such as bridges and tunnels