Directory Image
This website uses cookies to improve user experience. By using our website you consent to all cookies in accordance with our Privacy Policy.

Why is the short construction period of steel structure workshops an advantage?

Author: Yili Steel
by Yili Steel
Posted: Dec 22, 2019

It has always been said that the construction period of the steel structure workshop is one of the advantages. Why do you say that? For example, under the premise of ensuring the construction time of the steel structure industrial plant, the shorter the construction period, the faster the steel structure plant is put into use, and the faster the economic benefits are harvested, so the short construction cycle of the steel structure is one of its advantages. So how can the steel structure industrial plant guarantee the construction period? Let’s take a look together!

1. Select and dispatch outstanding management personnel to form a project management team, implement planning, organization, coordination, control, supervision, and command functions for the construction of steel structure plant engineering. At the same time, select a professional team to ensure the high standards of the project.

2. Promote comprehensive plan management, conscientiously compile practicable schedules and corresponding operation plans for steel structure factory building projects, coordinate construction production up and down, and link long and short plans to ensure the implementation of the plan, thereby ensuring the realization of the total duration of the project.

  1. In order to speed up the construction speed, take measures to reasonably arrange the interspersed construction operations, steel structure processing, cap construction, steel structure installation, roof envelope installation, door and window processing, and installation cross construction, the operation must obey the unified arrangement of the general contractor, and according to the construction, The overall schedule plans a specific schedule to ensure that the construction is carried out in a scientific and orderly manner.
  2. Make full preparations before starting work, including materials, tools, and personnel.
  3. Do a good job of reviewing the drawings, and find that the problems are resolved in the technical communication, avoiding the delay of the construction period due to design changes in the construction of the steel structure factory building, and preparing the practical construction organization design and the main sub-item construction operation design in a timely manner. Construction operations provide a reliable guarantee.
  4. Do the ideological work of the staff well, explain the importance of undertaking the project, the seriousness of the commitment of the construction period, and ensure the realization of the total construction period.
  5. The guarantee of material resources is a necessary condition to ensure the smooth progress of the project, and the plan for entering the site for materials, tools, and equipment are made early, and the site is entered in advance according to the schedule. Strengthen the inspection and maintenance of electromechanical equipment, eliminate the "sick" operation phenomenon, arrange on-site capable maintenance personnel, and ensure that the mechanical integrity of the steel structure workshop construction reaches 85% or more.
  6. The production scheduling meeting will be held every day and checked daily. If there are delays, it will be resolved in a timely manner through measures to increase the labor force. If there are problems with the supply of manpower, machinery, materials, etc., it should be resolved in a timely manner by the company.

from:http://en.qdyili.com/products/Steel-Structure-Workshop/

About the Author

Steel Structural analysis is a very important part of a design of buildings and other built assets such as bridges and tunnels

Rate this Article
Leave a Comment
Author Thumbnail
I Agree:
Comment 
Pictures
Author: Yili Steel

Yili Steel

Member since: Nov 14, 2019
Published articles: 11

Related Articles