The Different Ways That Each Six Sigma Belt Uses DMAIC

Author: Kanika Bhardwaj
by Kanika Bhardwaj
Posted: Jul 19, 2025

The DMAIC process—Define, Measure, Analyze, Improve, and Control—is at the core of the Six Sigma process improvement. It provides a clear-cut formula to minimize defects, enhance quality, and maximize efficiency. However, how each professional utilises DMAIC depends a lot on their Six Sigma belt level.

From White Belt to Master Black Belt, each level brings unique responsibilities and perspectives to the table. In this blog post, we’ll explore how the DMAIC methodology is used differently by Six Sigma belts and why understanding these differences matters in real-world projects.

What Are the Six Sigma Belts and Why Do They Matter?

Before diving into how each belt uses DMAIC, it’s important to understand what the belts represent.

Six Sigma also has a martial arts-style belt structure to identify growing levels of information and control:

  • White Belt – Beginning awareness

  • Yellow Belt – Basic understanding team member

  • Green Belt – Project specialist or leader

  • Black Belt – Full-time project manager and expert

  • Master Black Belt – Strategic coach and advisor

Every level of belt has a specific job in the DMAIC process, from implementation to management. Now let's dissect how these levels work with the methodology.

How Do White Belts Utilize DMAIC?

White Belts are new to Six Sigma, typically. They have minimum training and typically assist improvement projects, but do not lead them.

Main Contributions in DMAIC:

  • Define: Learn to see the problem from the customer's point of view.

  • Measure: Aid in gathering base data, e.g., timing a process or completing surveys.

  • Analyze: Aid team brainstorming or root cause analysis workshops.

  • Improve: Assist in testing changes under guidance.

  • Control: Help monitor improvements once changes are in place.

Although White Belts do not manage DMAIC projects, their involvement is key to establishing a culture of continual improvement.

What Is the Role of Yellow Belts in the DMAIC Methodology?

Yellow Belts know more about Six Sigma tools than White Belts and actively participate in DMAIC projects.

How Yellow Belts Use DMAIC:

  • Define: Assist in defining objectives and determining what the customer wants.

  • Measure: Aid in establishing measurement criteria and gathering data accurately.

  • Analyze: Utilize aids such as fishbone diagrams and Pareto charts to investigate causes

  • Improve: Identify easy process changes and pilot their effect.

  • Control: Monitor measurements after implementation and reinforce adherence to new procedures.

Yellow Belts tend to be the "voice of the process," providing useful frontline information on DMAIC projects.

How Do Green Belts Use the DMAIC Approach?

Green Belts are trained specialists who tend to drive their own improvement initiatives along with other job duties.

Responsibilities in Each Phase:

  • Define: Develop project charters, define scope, and set targets based on customer voice (VOC).

  • Measure: Conduct a statistical analysis to learn about baseline performance.

  • Analyze: Employ data to discover root causes by conducting regression analysis or hypothesis testing.

  • Improve: Design and execute improvements such as process adjustments, error-proofing, or automation.

  • Control: Create control plans and monitoring systems to maintain gains.

Green Belts implement the DMAIC approach in hands-on mode and are critical to mid-sized projects.

What's the Role of Black Belts in DMAIC Execution?

Black Belts are full-time Six Sigma practitioners responsible for running high-impact projects and mentoring Green and Yellow Belts.

Black Belts in the DMAIC Phases:

  • Define: Align project goals with organizational strategy and financial objectives.

  • Measure: Leverage sophisticated tools such as Gage R&R and process capability analysis.

  • Analyze: Utilize predictive modeling and design of experiments (DOE).

  • Improve: Sponsor cross-functional workshops and oversee change initiatives.

  • Control: Formalize improvements by revising SOPs and training.

Black Belts sponsor projects with quantifiable financial outcomes. Their intimate understanding of the DMAIC methodology positions them as organizational change agents.

How Do Master Black Belts Utilize DMAIC Differently?

Master Black Belts play at a strategic level. They do not lead DMAIC projects very often, but they affect several teams and drive quality standards across the organization.

Strategic Impact in DMAIC:

  • Define: Drive projects to be aligned with business strategy and customer requirements.

  • Measure: Standardize data collection methods and metrics across projects.

  • Analyze: Validate project data and review findings for consistency.

  • Improve: Share best practices and lead solution design across departments.

  • Control: Audit control plans and develop long-term capability.

Master Black Belts lead Six Sigma culture, enterprise-level change, and how the DMAIC methodology is applied across the organization.

FAQ

Q: What's the biggest difference between Black and Master Black Belts?

Master Black Belts are concerned with strategy, governance, and coaching at the team level, and Black Belts oversee single projects.

Q.Why Does Belt-Level Usage of DMAIC Matter?

Knowing which belt employs the DMAIC methodology for each level enables organizations to distribute resources optimally. It guarantees that the correct individuals are addressing the proper issues at the correct level of complexity.

From the task-oriented work of Yellow Belts to the enterprise leadership of Master Black Belts, the belt system provides scalability and standardization for quality improvement.

Q: Do all companies need to have all belt levels?

Not necessarily. The appropriate combination depends on company size, industry, and process complexity.

Final Thoughts: A Unified Approach, Custom Application

The DMAIC approach is universal among all Six Sigma belts—but the application differs greatly. White Belts sit back and assist, Green Belts champion projects, Black Belts facilitate change, and Master Black Belts guide strategy.

Together, they form a harmonious force for improvement—each level building upon the last. The outcome? A systematic, data-based method for problem-solving that can scale from the factory floor to the boardroom.

By grasping these differences, organizations can deploy and train talent more efficiently so that Six Sigma is not merely a certificate—but a functioning system of improvement.

About the Author

We are a fast-growing IT and digital services company based in Gurugram, India. Established in 2023, the company specializes in business process outsourcing (BPO), digital marketing, and tech-driven business solutions.

Rate this Article
Leave a Comment
Author Thumbnail
I Agree:
Comment 
Pictures
Author: Kanika Bhardwaj

Kanika Bhardwaj

Member since: Jun 24, 2025
Published articles: 13

Related Articles