Define demand and quality targets
Start by quantifying peak flow, daily volume, and the water grade required—potable, process, or utility. Identify key parameters such as turbidity, hardness, iron, hydrocarbons, and microbial counts. Map uses by unit operation to avoid oversizing and to separate high-spec streams from general service water.
Choose fit-for-purpose modules
Temporary systems are built from standard blocks: intake screens, bag or cartridge filters, clarifiers, media filters, activated carbon, softeners, reverse osmosis, UV, and chemical dosing. Add clean storage tanks sized for peak buffering and fire water needs. Use duty/standby pumps to protect uptime and install flow-balanced manifolds for parallel trains. Get fast, flexible solutions with temporary water equipment
- visit our website to find the right setup today!
Right-size for flow and footprint
Match skid capacity to real peaks, not nameplate guesses. Trailered or containerized units simplify placement and security. Select pumps with variable-frequency drives for changing demand. For membranes, design recovery with antiscalant and periodic cleaning windows. Leave space for future trains so scaling up does not disrupt production.
Plan deployment logistics early
Confirm crane or forklift access, pad loading, spill containment, and drainage. Check electrical availability, generator compatibility, and harmonics. Locate sampling ports before and after each major step. Use quick-connect camlocks and hygienic hoses to speed hook-up and reduce leak points. Label every line and valve for clear operations.
Meet compliance and safety requirements
Align permits for abstraction and discharge, and verify backflow prevention into site mains. Store chemicals with segregation and secondary containment. Build a Water Safety Plan covering hazard controls, monitoring, and incident actions such as boil notices or shutdown criteria. Train operators on lockout, confined space, and chemical handling.
Operate with data, not guesswork
Set thresholds for differential pressure, chlorine residual, conductivity, and tank levels. Enable telemetry with alarms for flow, pressure, and quality limits. Define maintenance triggers: cartridge changeouts, resin regeneration, membrane cleaning, and UV lamp replacement. Keep a spare-parts kit for seals, lamps, hoses, and instruments.
Control total water cost
Request transparent pricing for equipment, service, media, power, freight, and waste handling. Benchmark cost per cubic meter at expected recovery and energy rates. Tie payments to water quality and availability guarantees. Use washable prefilters where solids load is high and standardize on common cartridges across skids.
Plan scale-down and handback
Document off-hire conditions, decontamination steps, media disposal routes, and transport. Capture lessons learned on flow variability, fouling drivers, and response times. A structured demobilization prevents delays and sets a template for the next outage, turnaround, or capacity ramp.
Author Resource:-
Lee Wood writes about sustainable and scalable water and wastewater treatment solutions.
About the Author
Author Bio:- This article is written by Lee Wood. He has got into writing professionally and uploads regular informative articles.
Rate this Article
Leave a Comment